Client: Santa Monica Mountain NRA, Rehabilitate Solstice Canyon Facilities
Location: Malibu, CA
Cost: $2 Million (Fee)
Completion Date: 2002
Role
Anil Verma Associates, Inc. provided Inspection Services for this facility.
Description
Construction of a steel bridge, streambed modifications requiring stream diversion, 2” & 4” PVC water lines, vault toilets, an open-air shelter, an asphalt parking area and walks with seal/chip, seal/chip on existing road surface, stone-faced concrete retaining walls, an entrance gate with stone-faced concrete barrier walls, a small aggregate parking area, a gray water waste system with drain-field, a log seating amphitheater, drinking fountains, exterior lavatories on the vault toilets, two pay phones with underground service, demolition of buildings and a concrete stream ford, road width reduction, and landscape planting.