Purple Line Extension Section 2 Project, Construction Management Support Services, No. AE24663MC072

Client: Los Angeles County Metropolitan Transportation Authority
Location: Los Angeles, CA
Cost:  Unknown
Completion Date:  April 26, 2017-On going


Role :  

AVA is responsible as a Station Construction Manager for the Wilshire/Rodeo Station and the Century City/Constellation Station on Section 2 of the Purple Line Heavy rail Subway System.

Description

Purple Line Extension Section 2 is defined by twin-bored tunnels with connecting cross passages that convey the guideway between two stations.  There are two stations along this alignment.  Tunnel Reach 4 is between the tunnel interface west of Wilshire/La Cienega Station and Wilshire/Rodeo Station (Rodeo Station).  Tunnel Reach 5 is between Wilshire/Rodeo and Century City/Constellation Stations (Constellation Station).  The subway tunnels will run beneath Beverly Hills High School and the AAA building between the Rodeo and Constellation Stations.

Size :  

9 mile Heavy Rail Subway Extension from Wilshire/Western Station to Westwood/VA Hospital,  7 New Stations