MQ055 Structural Inspection Services Light and Heavy Rail System

Client: Los Angeles County Metropolitan Transportation Authority (LACMTA)
Location: Los Angeles, CA
Cost:  $827,000
Completion Date: 2004


Role

Responsibilities included: Project Management, Field Inspection Services, Reporting & Database creation.

Description

Projects included inspection of heavy rail and light rail transit facilities to verify the structural integrity of operating and non-operating segment rail structures, trackways, parking structures, intermodal facilities, maintenance shops and storage facilities, underground and overhead structures, passenger stations, train and yard control facilities, central controls and communications facilities, and transmission support structures, including steel bridges and reinforced concrete bridges. All structures were meticulously inspected during rail operation and non-operation hours during the daytime and nighttime.  Detailed-inspection findings were used to create a database for remedial action and deficiency removal.  This is a PUC requirement that mandates LACMTA to perform periodic inspections to ensure structural soundness for safe operations.

Size:          All tunnels underground stations, overhead guideways  structures,  bridges, and at grade line segments for eleven (11) miles of Metro                               Red Line Heavy Rail, twenty two (22) miles of  Blue Line Light Rail, and twenty (20) miles of Green Line Light Rail.