BART Oakland Airport Connector Project

Client: Bay Area Rapid Transit District (BART)
Location: Oakland, CA
Cost:  $485 Million
Completion Date: ongoing


Role

Responsibilities include Design, Construction Support and Oversight for this Design-build project including Structural/Civil Engineering and Art review.

Description

Oakland Airport Connector is a 3.2 mile Automated Guideway Transit (AGT) system connecting the Coliseum/Oakland Airport BART Station and the airport terminal. From the Coliseum/Oakland Airport BART Station to Doolittle Drive, the alignment proceeds largely in the median of Hegenberger Road south of Doolittle Drive on Oakland International Airport property. The AGT system includes a maintenance facility and (2) end terminal stations: One at the BART station and one at the proposed airport terminal.

 

Posted in: