Oakland Airport Connector Project – BART

Client: Bay Area Rapid Transit District (BART)
Location: Oakland, CA
Cost:  $485 Million
Completion Date: On-going


Role

Responsibilities include Design, Construction Support, and Oversight for this Design-Build Project including Structural/Civil Engineering and Art Review.

Description

Oakland Airport Connector is a 3.2-mile Automated Guideway Transit (AGT) system connecting the Coliseum/Oakland Airport BART Station and the Airport Terminal. From the Coliseum/Oakland Airport BART Station to Doolittle Drive, the alignment proceeds largely in the median of Hegenberger Road south of Doolittle Drive on Oakland International Airport property. The AGT system includes a maintenance facility and (2) end terminal stations: One at the BART station and one at the proposed airport terminal.

Posted in: