Silicon Valley Berryessa Extension – Milpitas Transit Center
SVBX Project Overview
The Silicon Valley Berryessa Extension (SVBX) Phase I project marks a significant ten (10 mile) expansion of the operational BART Heavy Rail System, linking Fremont’s Warm Springs station to San Jose’s Berryessa. Led by AVA as the Architect of Record (AOR), Landscape Architect (LAOR) and Engineer of Record (EOR), this Design-Build endeavor includes multimodal Milpitas Station and Berryessa Station, alongside essential infrastructure like Bus Transit Centers, BART Transit Facilities and Parking Structures. AVA’s role encompassed comprehensive planning, design, and construction administration support in areas such as Architecture, Landscape Design, Structural, and Electrical Engineering. The AVA Team collaborated closely with the joint venture Design-Build Team to deliver final design documents and ensure seamless execution throughout the project’s duration.
SVBX Milpitas Underground Station
The Milpitas Underground Station has a Pedestrian Overcrossing Bridge which connects to and operational VTA Light Rail System, Bus Transit Center, BART Police Facility, Parking Structure, Bike Storage/Bus Operators Facility, and related wayside facilities. AVA Team designed and supported the project through its entirety, ensuring seamless integration and functionality of the 27-acre Milpitas Station campus, during the construction phase.