Prime Consultant responsible for architecture, structural, mechanical and electrical engineering, with civil, landscape and other engineering services done locally. The KHSG Contract consists of: Pearl Highlands Stations, Pearlridge Station, Aloha Stadium Station and the H2R2 Ramp. HART Project is a twenty (20) mile grade separated fixed guideway transit system running between East Kapolei and Ala Moana. Description: Final Design of three complex aerial stations & a freeway ramp & coordination with guideway & systems contractors.

Pearlridge station

Pearlridge Station’s platform structure spans over the thirty (30) foot wide concourse bridge which connects to the at-grade station entrance structures located on either side of Kamehameha Highway. A Traction Power Substation (TPSS) and a separate ancillary building housing the train control and communications room are on the site. Other equipment rooms are located on the parcel containing the Makai entrance building. The station entrance structures are connected to the platforms by this elevated pedestrian concourse bridge which straddles Kamehameha Hwy several levels above the street. The site design includes site landscaping, construction of both TPSS station ancillary facilities, driveways, site drainage and utility service connected at an interface point coordinated with the guideway design-build contractor.

Kalauao

Design-Bid-Build

  • Concourse Bridge

    Elevated pedestrian bridge spans Kamehameha Highway for easy access

  • Advanced Facilities

    Houses train control and communication rooms in dedicated buildings

  • Site Enhancements

    Includes landscaping, drainage systems, and utility connections​

Connect with Us

Let’s Build the Future Together

Whether you have a project in mind or just want to learn more about our services, we’re here to help. Contact us today to discuss how we can bring your vision to life.