Los Angeles Trade Technical College Modernization Projects
The Los Angeles Trade Technical College
The LATTC modernization efforts transformed the campus through several significant projects, including new buildings, restorations, and infrastructure improvements. These projects were funded under the $2.1 billion Proposition A/AA and $3.5 billion Measure J bond programs, designed to accommodate increased student enrollment and enhance sustainability.
Comprehensive Leadership in Campus Transformation
Anil Verma Associates, Inc. (AVA) played a central role as Campus Project Manager, overseeing the planning, design, and construction phases across multiple projects. AVA ensured that each project adhered to quality control, budget, and schedule constraints while achieving LEED certifications. The modernization work included six LEED-certified buildings, advanced learning spaces, and state-of-the-art facilities.
Key Projects:
-
South Campus Project
- Two five-story LEED Platinum buildings housing classrooms, lecture halls, and student services.
- Role: Managed all phases from design to construction.
- Cost: $99.7 Million
- Timeline: 2002–2014
- Two five-story LEED Platinum buildings housing classrooms, lecture halls, and student services.
-
Learning Resource Center (LRC)
- An 82,000 sq. ft. library renovation and 15,000 sq. ft. expansion for enhanced student services.
- Role: Managed design and construction phases.
- Cost: $39 Million
- Timeline: 2007–2015
- An 82,000 sq. ft. library renovation and 15,000 sq. ft. expansion for enhanced student services.
-
Child Development Center (CDC)
- A 14,500 sq. ft. LEED-certified building offering classrooms, offices, and playgrounds.
- Role: Delivered project management and sustainability compliance.
- Cost: $10.6 Million
- Timeline: 2002–2012
- A 14,500 sq. ft. LEED-certified building offering classrooms, offices, and playgrounds.
-
Building ‘A’ Modernization and Restoration
- A 100,000 sq. ft. historic building upgraded to meet LEED Silver standards with seismic retrofits.
- Role: Directed design and construction management.
- Cost: $67.5 Million
- Timeline: 2007–2017
- A 100,000 sq. ft. historic building upgraded to meet LEED Silver standards with seismic retrofits.
-
Construction Technology Building (CTB)
- A 160,000 sq. ft., 3-story LEED Gold building with modern classrooms and laboratories.
- Role: Managed design-build process and construction.
- Cost: $70 Million
- Timeline: 2008–Ongoing
- A 160,000 sq. ft., 3-story LEED Gold building with modern classrooms and laboratories.
- East Parking Structure (EPS)
- A six-level, net-zero energy building with 1,000 parking spaces and sustainable design features.
- Role: Oversaw design-build process and project execution.
- Cost: $20 Million
- Timeline: 2009–2016
- A six-level, net-zero energy building with 1,000 parking spaces and sustainable design features.
- Culinary Arts Facility
- A 50,000 sq. ft. world-class facility supporting LATTC’s renowned Culinary Arts program.
- Role: Coordinated programming and design services.
- Cost: $33 Million
- Timeline: 2006–2019
- A 50,000 sq. ft. world-class facility supporting LATTC’s renowned Culinary Arts program.