Silicon Valley Berryessa Extension Project (SVBX)

Campus Roadway & Parking Structures

SVBX UPC Site

Client: Valley Transit Authority
Location: San Jose, CA

Date: on-going


AVA, as sub-consultant to the Planning Team, is responsible for Architectural, Mechanical, Electrical, and Structural Engineering services at the two BART station campus sites of the Silicon Valley Berryessa Extension Project, which are the Berryessa and Milpitas stations. AVA’s responsibilities at the Berryessa Station includes the development of design-bid-build documents for the BART Police Zone Facility (5,000 square feet) and Bus Transit Center canopies (10) along with design-build bridging documents for the parking structure (1490 cars). At the Milpitas Station, AVA is developing design-build bridging documents for the parking structure (650 cars).