Fontana Metrolink Commuter Rail System

Client: Southern California Regional Rail Authority (SCRRA)
Location: Fontana, CA
Completion Date: 1995


Role

AVA was responsible for resident engineering, office engineering, scheduling, cost engineering, estimating, contract administration, and inspection.

Description

The project consisted of passenger station, parking structures and lots, maintenance buildings, trackwork, electrical control, utility systems and bridges (San Bernardino Flyover bridge consists of a 250 ft. precast girder over a flood control area, and a 550 ft. precast span over the Santa Fe Railroad.