Ramona Blvd.

RAMONA BLVD. FREIGHT LINE/COMMUTER RAIL GRADE SEPARATION PROJECT – ACE

El Monte, CA


  1. Ramona rendering

The Ramona Boulevard Grade Separation Project will require Ramona Boulevard be lowered approximately 26 feet beneath the existing railroad tracks. Two bridges will be built to carry railroad traffic over the depressed Ramona Boulevard, which includes pedestrian, and motorist safety improvements and walkways with protective railing.

CLIENT: ALAMEDA CORRIDOR EAST CONSTRUCTION AUTHORITY
DATE: Completed 2008