SVBX

SILICON VALLEY RAPID TRANSIT BART EXTENSION PROJECT (SVBX)

Campus Roadway & Parking Structures
San Jose, CA


  1. Rendering provided by client
  2. Rendering provided by client

AVA, as sub-consultant to the Planning Team is responsible for Architectural, Mechanical, Electrical and Structural Engineering services at the two BART station campus sites of the Silicon Valley Rapid Transit BART Extension Project, which are the Berryessa and Milpitas stations. AVA’s responsibilities at the Berryessa station includes development of design-bid-build documents for the BART Police Zone Facility (5,000 square feet) and Bus Transit Center canopies (10) along with design-build bridging documents for the parking structure (1490 cars). At the Milpitas station AVA is developing design-build bridging documents for the parking structure (650 cars).

CLIENT:VALLEY TRANSIT AUTHORITY
DATE: On-going