City of Santa Clarita Vista Canyon

VISTA CANYON MULTIMODAL CENTER (METROLINK STATION)

Santa Clarita, CA


As one of the first location in California where gold was found occurred near the station, the design character reflects a gold strike theme as well as California rustic detailing reflecting the surrounding master plan community. As part of changing to a double track project, a center platform has been designed including canopies, ramps and stairs, and accessed by a pedestrian underpass. The entrance plaza, site lighting, landscape design, and drainage was also included. AVA is preparing paperwork for the station in anticipation to submit for a gold LEED rating.

CLIENT: City of Santa Clarita
DATE: 2020