Ramona Boulevard Grade Separation Project

 
Ramona Boulevard Grade Separation Project

AVA's Role
Anil Verma Associates, Inc. is part of the LAN Engineering Team that has been selected to perform construction management services for this Project. AVA responsibilities include: Inspection, Safety/Field Engineering

 
Client
Alameda Corridor East Construction Authority (ACA), El Monte, CA

Project Description
The Ramona Boulevard Grade Separation Project will require Ramona Boulevard be lowered approximately 26 feet beneath the existing railroad tracks. Two bridges will be build to carry railroad traffic over the depressed Ramona Boulevard, which will include pedestrian and motorist safety improvements and walkways with protective railing.


Cost
$41.6 Million

Status
Completion date: 2007