AVA's Role
Anil Verma Associates, Inc. is part of the LAN Engineering Team that has been selected to perform construction management services for this Project. AVA responsibilities include: Inspection, Safety/Field Engineering

 
Client
Alameda Corridor East Construction Authority (ACE), Irwindale, CA

Project Description
The grade separation of Nogales Street under the railroad tracks and Valley Boulevard required Nogales Street to be lowered approximately 20 feet. Two bridges were built to carry motorists and trains over Nogales Street. A loop connector road replaced the former intersection of Nogales and Valley.


Cost
$47.5 Million

Status
Completion date: 2005