Pasadena Los Angeles Light Rail Alternatives Analysis and EIR, <br>Los Angeles, CA

Pasadena Los Angeles Light Rail Alternatives Analysis and EIR, <br>Los Angeles, CA

Pasadena Los Angeles Light Rail Alternatives Analysis and EIR, <br>Los Angeles, CA

Pasadena Los Angeles Light Rail Alternatives Analysis and EIR, <br>Los Angeles, CA

 
Pasadena Los Angeles Light Rail Alternatives Analysis and EIR,
Los Angeles, CA

AVA's Role
Architect responsible for conceptual Station Planning & Design for Route Refinement, Engineering Feasibility Analysis and the Environmental Impact Report (EIR).

 
Client
Los Angeles County Metropolitan
Transportation Authority (LACMTA)
Los Angeles, CA

Project Description
AVA prepared conceptual station studies along four alternative alignments between Pasadena and Los Angeles, and five alternative alignments in the Pasadena downtown area. Studies included two and three dimensional station concept graphics to assist client with presentations to City Agencies and Communities along the route. Responsibilities included: station engineering feasibility and site circulation studies for bus and auto interface. AVA prepared station site plans and reports, and conceived joint property development concepts for specific sites.AVA located stations on alternative routes, performed Visual Impact Analysis and Presentation Graphics for Client’s approval and Citizen’s meetings.


Cost
$900,000,000 (budget estimate)

Status
Completion date for EIR: 1992

Click here for a printer friendly version

©Copyright 2008 Anil Verma Associates, All rights reserved