Department of Water & Power, Main Street General Services Headquarters <br> Phase II

 
Department of Water & Power, Main Street General Services Headquarters
Phase II

AVA's Role
AVA was responsible for civil and utility engineering. This included the general site plans, existing utility plans, demolition and removal plan, horizontal control plan, paving, grading and drainage plan.

 
Client
Department of Water and Power
City of Los Angeles, CA

Project Description
Anil Verma Associates (AVA), Inc. was a part of a design team that was responsible preparing final architecture and engineering design for the Department of Water & Power general services headquarters building. Several concepts were developed for client approval, and a final one selected to appropriately reflect the image of the Department & Power, both functionally and aesthetically. Construction documents, plans, specifications, and cost estimates for this facility were engineered in great detail.


Cost
$11,000,000

Status
Completion in 1993 (Engineering)

Click here for a printer friendly version

©Copyright 2008 Anil Verma Associates, All rights reserved